The full renovation of a 4 bed/1.5 bath condo (approx. 1,238 sqf) in the rural area of Eastern Switzerland. The owner family had a budget of approx. $120k to redesign the dwelling's structure to their specific needs. Our responsibilities included demolition, restructuring of rooms, carpentry works, tiling, painting and further finishing works.
![]() 1. Entrance area before renovation | ![]() 2. Part of the entrance area with view into the kitchen / new paint and cork flooring | ![]() 3. Kitchen remained untouched |
---|---|---|
![]() 4. Eating area before renovation | ![]() 5. Replacement of skylight | ![]() 6. Cutout for new skylight |
![]() 7. New skylight installed ready for insulation | ![]() 8. Skylight ready for roofing | ![]() 9. Wood paneling assembly at the kitchen ceiling. |
![]() 10. New skylight, wood panel and paint in eating area | ![]() 11. Eating area finished / bigger skylight new wood paneling and paint | ![]() 12. Living room before renovation |
![]() 13. Living room finished / new wood paneling on ceiling, cork flooring and paint | ![]() 14. Dining area with wood burning stove | ![]() 15. Dining area finished |
![]() 16. Master bedroom before renovation | ![]() 17. Plastering ceiling beams in master bedroom | ![]() 18. Master bedroom finished with bigger skylight |
![]() 19. Mount wooden batten on the wall to separate the office from the hallway. | ![]() 20. Office door opening ready for insulation | ![]() 21. Office space wall ready for insulation |
![]() 22. Office wall ready for drywalling | ![]() 23. New office space | ![]() 24. Kids bedroom before renovation |
![]() 25. Building walls between the two kids bedroom | ![]() 26. Kids bedroom wall ready to drywalling | ![]() 27. Reinforce the insulation of the kids bedrooms' outside wall |
![]() 28. New kids bedroom finished / bigger skylight new flooring, would paneling and paint | ![]() 29. Main bath before renovation | ![]() 30. Main bathroom after demolition |
![]() 31. Leveling main bathroom wall with concrete | ![]() 32. Main bathroom with lowered ceiling for light fixtures / ready for drywalling | ![]() 33. Wall between main bath and kids bedroom ready for drywalling and insulation |
![]() 34. Wall between kids bedroom and main bathroom / drywalling in process | ![]() 35. Preparation of the main bathroom wall for install tiles | ![]() 36. Cutting drywalls for installation in main bath |
![]() 37. Wall closed between main bath and kids bedroom | ![]() 38. Geberit Duofix carrier and concealed tank for wall-hung toilets | ![]() 39. Main bath before floor tiling |
![]() 40. Plastered ceiling in the main bath | ![]() 41. Main bath before sink and toilet are installed | ![]() 42. Bathtub before installation of faucet |
![]() 43. Main bath finished | ![]() 44. Bathtub with shower head in main bath finished / new skylight |