The full renovation of a 4 bed/1.5 bath condo (approx. 1,238 sqf) in the rural area of Eastern Switzerland. The owner family had a budget of approx. $120k to redesign the dwelling's structure to their specific needs. Our responsibilities included demolition, restructuring of rooms, carpentry works, tiling, painting and further finishing works.

DSC02592

1. Entrance area before renovation

IMG_2443

2. Part of the entrance area with view into the kitchen / new paint and cork flooring

IMG_2445

3. Kitchen remained untouched

DSC02532

4. Eating area before renovation

DSC03005

5. Replacement of skylight

DSC03000

6. Cutout for new skylight

DSC03018

7. New skylight installed ready for insulation

DSC03034

8. Skylight ready for roofing

DSC04589

9. Wood paneling assembly at the kitchen ceiling.

IMG_2446

10. New skylight, wood panel and paint in eating area

DSC04606

11. Eating area finished / bigger skylight new wood paneling and paint

DSC02543

12. Living room before renovation

IMG_2438

13. Living room finished / new wood paneling on ceiling, cork flooring and paint

IMG_2449

14. Dining area with wood burning stove

IMG_2439

15. Dining area finished

DSC02545

16. Master bedroom before renovation

DSC03985

17. Plastering ceiling beams in master bedroom

DSC04621

18. Master bedroom finished with bigger skylight

DSC03954

19. Mount wooden batten on the wall to separate the office from the hallway.

DSC03980

20. Office door opening ready for insulation

DSC03983

21. Office space wall ready for insulation

DSC03994

22. Office wall ready for drywalling

IMG_2434

23. New office space

DSC02555

24. Kids bedroom before renovation

DSC03465

25. Building walls between the two kids bedroom

DSC03381

26. Kids bedroom wall ready to drywalling

DSC03314

27. Reinforce the insulation of the kids bedrooms' outside wall

DSC03833

28. New kids bedroom finished / bigger skylight new flooring, would paneling and paint

DSC02573

29. Main bath before renovation

DSC02712

30. Main bathroom after demolition

DSC02861

31. Leveling main bathroom wall with concrete

DSC02937

32. Main bathroom with lowered ceiling for light fixtures / ready for drywalling

DSC02851

33. Wall between main bath and kids bedroom ready for drywalling and insulation

DSC02906

34. Wall between kids bedroom and main bathroom / drywalling in process

DSC02716

35. Preparation of the main bathroom wall for install tiles

DSC02909

36. Cutting drywalls for installation in main bath

DSC03192

37. Wall closed between main bath and kids bedroom

DSC02736

38. Geberit Duofix carrier and concealed tank for wall-hung toilets

DSC03092

39. Main bath before floor tiling

DSC03169

40. Plastered ceiling in the main bath

DSC03134

41. Main bath before sink and toilet are installed

DSC03168

42. Bathtub before installation of faucet

IMG_2433

43. Main bath finished

DSC03840

44. Bathtub with shower head in main bath finished / new skylight